The duration and execution of preventive maintenance (PM) activities have a significant impact on maintaining effective control over factory equipment while ensuring that it is healthy and available for production. Although most PMs in the industry have similar structures, the task of generating an automated segmented view of the PM duration and flow to highlight inefficiencies and corresponding opportunities for improvement is complicated by a reliance on manual data entries made by human operators. In addition, most optimization and analysis models treat a PM as a single activity while ignoring its parts. In this paper, a model is proposed to generically segment a PM into its parts and define the expected PM duration. The segmentation, done automatically by sequencing the lots run on the tool, results in a clear overview of time losses in the PM and of opportunities for improvement.
اللغة الأصلية | الإنجليزيّة |
---|---|
عنوان منشور المضيف | 2015 26th Annual SEMI Advanced Semiconductor Manufacturing Conference, ASMC 2015 |
ناشر | Institute of Electrical and Electronics Engineers Inc. |
الصفحات | 280-285 |
عدد الصفحات | 6 |
رقم المعيار الدولي للكتب (الإلكتروني) | 9781479999309 |
المعرِّفات الرقمية للأشياء | |
حالة النشر | نُشِر - 22 يوليو 2015 |
الحدث | 26th Annual SEMI Advanced Semiconductor Manufacturing Conference, ASMC 2015 - Saratoga Springs, الولايات المتّحدة المدة: ٣ مايو ٢٠١٥ → ٦ مايو ٢٠١٥ |
سلسلة المنشورات
الاسم | 2015 26th Annual SEMI Advanced Semiconductor Manufacturing Conference, ASMC 2015 |
---|
!!Conference
!!Conference | 26th Annual SEMI Advanced Semiconductor Manufacturing Conference, ASMC 2015 |
---|---|
الدولة/الإقليم | الولايات المتّحدة |
المدينة | Saratoga Springs |
المدة | ٣/٠٥/١٥ → ٦/٠٥/١٥ |
ملاحظة ببليوغرافية
Publisher Copyright:© 2015 IEEE.